| The Hull |
|
The details of this step vary slightly
depending on the type of construction. The
second payment is due when the walls are
poured.
| • |
With gunite construction the
steel rebar is installed, plumbing
run, and the floor is poured with
concrete.
|
|
 |
| |
The walls are then shot with
gunite and tile installed.
|
| • |
If your pool is a vinyl liner
pool; the aluminum wall panels are
set, rebar is installed, and the
concrete walls are poured. The
plumbing is then run to the
equipment area. |
|
| The Deck |
|
The pool is then backfilled. If you have
opted for stone or brick coping, the coping
is installed now. If you have concrete
cantilevered coping, the coping is poured in
place at the same time as the deck is
poured.
Steel rebar is installed, the concrete forms
are placed, and grounding wire is put in
place. |
 |
The concrete decking is poured. We typically
cut in expansion joints the following day.
The third payment is due when the deck is
poured. |
| The Interior Finish |
|
The details of this step
vary slightly depending on the
type of construction:
|
• |
With
gunite construction the interior is cleaned
and prepped, and the finish installed. The
finish may be marcite or exposed pebble
aggregate. The exposed pebble aggregate is
by far the superior material; it is more
durable and smoother than the marcite
finish. The pool is filled within hours. |
 |
| |
It is
important to fill the pool without stopping
the water so no soil ring is left on the
still fresh finish.
|
| • | If your pool is a
vinyl liner pool, the vermiculite bottom is
poured and walls are prelined with a foam
sheet. The final prep is done the following
day and the liner is installed. Your liner
has been measured to exacting standards,
sometimes requiring over 200 measurements. |
 |
| |
We begin filling the pool immediately and
allow it to fill to the top of the bottom
step. At that time we install the rest of
the faceplates and lights. We then fill your
pool completely. |
| The Final |
|
We will have the water in your pool
balanced when we schedule a training session
with you.
It is important that we teach you how to
operate your pool at your pool with your
equipment. And we are always only a phone
call away for any questions that arise.
|
 |
| The final payment is due at
this time. You are SWIMMING! |
|
|
|
|
| |
|